Cement grinding and manufacturing plant process
Cement Grinding Plant
For making cement, we requires
clinker, clay, gypsum or flyash. If we want to make OPC cement then we will use
gypsum. If we have to make PPC cement then we will use Flyash.
![]() |
"Factory of National Cement Share Company by DFID - UK Department for International Development, Wikimedia Commons, CC BY 3.0 |
Cement grinding plant is divided into five sections.
1)
Storage Yard section
2)
Proportioning Hopper section
3) Cement Mill section
4) Cement Silo section
5)
Packing section
1) Storage Yard section :-
Storage yard should be designed in such a way that raw material can be stored for 7 -10 days. In this section, raw material brought from outside is stored. Raw material may contain clinker, clay, gypsum or flyash and additives. All these have different storage yards.
![]() |
Charnwood Brick – 1 – Clay conveyor entering the works cc-by-sa/2.0 - © Alan Murray-Rust - geograph.org.uk/p/5857633 |
The storage yard consists of ground hoppers. At the bottom of
ground hopper has a pin gate or slide gate.. Which prevent the material from
escaping. This is followed by vibratory feeders. Which put the material on the
belt conveyor. This belt conveyor feeds to the proportioning hoppers.
2) Proportioning Hopper section:-
The hoppers in this section are made of mild steel or cement
concrete. The capacity of these hoppers is prepared at the base of the
percentage of material. For example, the percentage of clinker is most commonly
used to make cement. Therefore the hopper of the clinker is of the largest
size.
![]() |
Hanson Cement, Clitheroe cc-by-sa/2.0 - © Alan Murray-Rust - geograph.org.uk/p/4480158 |
Other hoppers have a lower capacity, such as gypsum / flyash, clay
and additives. The material on these hoppers is inserted with the help of
reversible belt conveyor or three way chute. All these hoppers are fitted with
pin gate or slide gate. For example, clinker and gypsum for slide gate,
flyash and clay for pin gate are used.
The weigh feeder is used to extract the appropriate quantity of
material. All materials are inserted on the belt conveyor with the help of
chute. This belt conveyor feeds the cement mill. In the proportioning hoppers,
venting connection must always be given. Venting greatly reduces the problem of
chocking. Apart from this, also keep in mind that it is very important to
provide a manhole connection in Proportioning hoppers so that it can be
repaired from time to time.
In MS hoppers, liner should always be used for abrasive material
to avoid hopper wear. Nowadays, high level and low level indicators are also
being provided in Proportioning hoppers. A poking hole must be provided in the
tapper portion of the hoppers so that the largest size of the material can be
broken with the help of rod which hinges the outlet of the hoppers.
3) Cement Mill section:-
Mill section is the main part of cement plant. It can also be
called the heart of an entire plant. We also know Mill section as cement mill
section. If we talk about cement mill section, then there are two types.
a) Open circuit b) Close circuit
a) Open circuit:-
The
cement mill section in which classifier is not used is called open circuit.
b) Close circuit:-
The cement mill section
in which classifier is used is called close circuit.
![]() |
Closed circuit cement grinding comprising an 18’ diam. air separator and a 2600 HP ball mill in Portugal. by N.N.Zoubov Engineers, Wikimedia Commons, CC BY-SA 3.0 |
Process :-
A two way chute is
placed at the discharge end of the belt conveyor which brings the material from
the hopper section. One end of the two way chute is attached to the cement
mill, while the other end is kept open to check the composition of the
material.
Proper lining of two way
chute should be done so that it does not wear. In the cement mill the material
is converted into fine powder. This is where cement is manufactured. The
fineness of cement depends on the Blaine.
The capacity of cement
mill depends on the capacity of the plant such that if the capacity of the
plant is 800 TPD then the capacity of the mill will be 800/20 = 40TPH. After
the cement mill, an air slide or screw conveyor is
attached which is connected to the outlet of the cement mill through the chute
and which is connected to the inlet of the bucket lift through the chute.
In the close circuit,
the bucket elevator sends the material to the classifier via air
slide. The classifier separates the coarse and fine material. The coarse
material is again poured into the mill via air slide while fine material is
sent to the cyclones. On the other hand, if we look in the open circuit, the
material is sent directly from the bucket elevator to the cyclones.
The rotary vane feeder
(RVF / RAL) is attached below the cyclones. A fine air slide is attached to the
rotary vane feeder which is connected to the bucket elevator or air lift
feeding in silo.
4) Cement Silo section :-
The fines air slide
which comes from the cement mill section and feed the bucket elevator, the same
bucket elevator feed into the silo top air slide. Many plants do not install
silo feeding bucket elevator.
![]() |
Cement Silos by 长城建机编辑处 , Wikimedia Commons, CC BY-SA 4.0 |
A high level indicator
is placed at the top of the silo. So that the cut can be made after the silo is
filled. With this, you should also know that there are two types of silo, one
flat bottom type silo and the other conical bottom type silo.
In Silo we store
material for two to three days. The capacity of silo depends on the capacity of
the plant. If the plant capacity is 800 TPD, the maximum capacity of silo will
be 800 X 3 = 2400 tonnes. The areation system is provided inside the bottom
part of the silo so that the cement does not get frozen in the bottom and
easily exits through the outlet. The slide gate and rotary vane feeder are
fitted under the silo.
5) Packing section:-
The cement is packed in bags in the packing
section. Many small plants do not have a separate packing section. In small
plants, packing is done using a packing machine just below the silo. There are
two types of packing machine, one stationary packing machine and the other
rotary packing machine / rotary packer.
The storage bin is attached before the packing machine, so that
the material pressure directly from the silo does not affect the packing
machine. A high level indicator is put in the storage bin. Proper venting of
packing machine and bin is very important.
Proper venting should
also be given to the packing area, as a result there is no dust in that area
and in it can be worked easily. The bag which is filled in the packing machine
is put on the truck loading belt conveyor or truck loading machine through the chute conveyor. These
truck loading belt conveyor or truck loading machine load the bags into the
truck by the workers.
Through these sections,
cement is prepared and reaches all of us.